GREENBUSHES LITHIUM MINE EXPANSION
BelpileYear: 2019
Talison Lithium Australia Pty Ltd (Talison) expansion of the Greenbushes Lithium Mine is expected to increase the production of spodumene ore and lithium mineral concentrate from the operation.
To facilitate the project works, CMR Tech was engaged by Belpile to undertake Static Load Testing as part of the Project.
CMR Tech worked with Belpile to perform both Static (3 tests) and Dynamic (9 PDA tests) at the Greenbushes Lithium Mine Expansion. Measurements were taken using the Pile Driving Analyzer® and were initially evaluated on site using the Case Method.
A CAPWAP analysis was then done on the data. CAPWAP® combines the measurements of the Case Method with a wave equation type numerical analysis and signal matching.
CMR Tech is equipped and prepared to journey to distant locations for vital pile testing operations. Collaborating with Belpile, our team swiftly mobilised to travel to Greenbushes, bringing along necessary equipment to establish and conduct the essential Static Load Testing with calibrated and compliant equipment.