TIP DETAILS
1 Project & Pile Information
CMR number from wire delivery sheet.
CMR
Enter your CMR number above
Auto-filled from database — can be changed.
2 Pile Geometry
Specified diameter of the drilled hole.
mm
Outside-to-outside — must be less than shaft.
mm
Total length of reinforcing cage.
m
3 Nodes Above Concrete
💡 Known after concreting only. Enter nodes visible above concrete surface per wire — establishes TOC in TIP analysis.
↑ Enter CMR ID to load wire details.
4 Reference Levels (RL) — All in metres AHD
💡 RL = Reduced Level — Australian Height Datum in metres. TOC can be above, equal to, or below PPL. COL is usually at the top ring of the cage.
Ground or working platform from which the rig drilled.
m RL
Actual RL of concrete top. If above PPL, Formatube assumed.
m RL
Pile head trim RL — usually top ring of cage. Below TOC.
m RL
RL at the very bottom of the drilled hole — below PPL.
m RL
🧱 Formatube assumed: TOC is above PPL — a Formatube casing above ground is shown on the diagram.
Water Table Present
— tick if groundwater is encountered
Approximate RL — must be between BOS and PPL.
m RL
Steel Casing Used
— tick if steel casing was installed
m RL
m RL
5 Concrete & Volume
Total m³ — include shaft + any above-ground extension (PDA ext., casing above PPL, etc.).
m³
Specified strength class, e.g. 32 MPa, 40 MPa.
Retarders, accelerators or fibres affect the heat signature.
SCM replacement % if known — affects hydration temperature curve.
6 Site & Soil Conditions
Brief description of soil layers with approximate RL boundaries.
7 Additional Notes
Ready to Submit
Click below to save your data to CMR Tech and download an Excel copy to your local folder.
✅ Details Submitted & DownloadedYour data has been saved to CMR Tech's system and an Excel copy has been downloaded to your local folder.
CMR Tech will be in touch shortly regarding your TIP analysis.
CMR Tech will be in touch shortly regarding your TIP analysis.
📐 Pile Parameter Reference Diagram
PPL — Piling Platform Level
TOC — Top of Concrete
COL — Cut-Off Level
BOS/TOE — Bottom of Shaft
Shaft Ø — Shaft Diameter
Cage Ø — Cage Diameter
Formatube Casing (above PPL)
Steel Casing
WT — Water Table