FORRESTFIELD AIRPORT LINK

GFWA Trevi Joint Venture

Year: 2018

The $1.86 billion Forrestfield-Airport Link project has delivered a new rail service to the eastern suburbs of Perth – with three new stations at Redcliffe, Airport Central and High Wycombe. Known as the Airport Line, the rail link supports part of the METRONET vision for a well-connected Perth with more transport, housing and employment choices.

To facilitate the project works, CMR Tech was engaged by the GFWA Trevi Joint venture to perform 3 Static Load Tests on barrettes for the Forrestfield Airport Link Project. 

At 3 different locations, Airport Central, Belmont and Bayswater Stations, 7-9 layers of strain gauges and extensometers were set up and tension tests were performed between 14 to 16 MN.  Over 50 channels of data were recorded to the data acquisition system.

More Experience

Pile Tension Test

PILE TENSION TESTPile tension load testing enables measurement of displacement as a pile is pulled...

STONE COLUMN TESTING, WHEATSTONE

Year: 2014The Chevron-operated Wheatstone Project is one of Australia’s largest resource...

EXMOUTH HARBOUR UPGRADE

Year: 2016The Exmouth Boat Harbour Upgrade project consisted of a major upgrade to the service...

GREENBUSHES LITHIUM MINE EXPANSION

Year: 2019Talison Lithium Australia Pty Ltd (Talison) expansion of the Greenbushes Lithium Mine is...

MUNGARI GOLD, KALGOORLIE

Year: 2024Mungari is located in the world class Eastern Goldfields district, around 20km west of...

NORTHLINK 2 PERTH

Year: 2020Construction of NorthLink WA provides a vital link between Morley and Muchea as part of...

Bi-directional Static Load Test

BIDIRECTIONAL STATIC LOAD TEST Regarded as one of the safest and most efficient techniques for...

Low Strain Dynamic Testing

LOW STRAIN DYNAMIC TEST Also known as Pulse Echo Test (PET) or Pile Integrity Test (PIT), this...

Lateral Load Test

LATERAL LOAD TESTINGLateral load testing is important for assessing the stability and performance...

Plate Load Testing

PLATE LOAD TESTINGPlate load testing is performed on a prepared ground surface and is a method for...